EVM 256GB 2.5" SATA III Internal Solid State Drive (SSD)
No reviews
/
sold in last hours
Rs. 1,299.00Rs. 3,999.00
68
Brand:
EVM
Availability:
Out of stock In stock
Title:
Buy now
Google Pay Mastercard Visa Paytm Generic
  • Description

    Experience a significant boost in your computer's performance with the EVM 256GB SATA III Solid State Drive (SSD). This 2.5-inch internal SSD is designed to provide faster boot times, quicker application loading, and improved overall responsiveness compared to traditional hard disk drives. With a storage capacity of 256 GB, it offers ample space for your operating system, frequently used applications, and important files. The SATA III interface ensures high-speed data transfer rates, making it an ideal upgrade for both laptops and desktops. Enjoy enhanced durability and reliability with this NAND flash-based SSD, which is less susceptible to physical shock and vibrations.

    Features:

    • 256GB Storage Capacity
    • 2.5-inch Form Factor
    • SATA III 6Gb/s Interface (backward compatible with SATA II)
    • Significantly faster read and write speeds compared to HDDs
    • Enhanced system responsiveness and boot times
    • Durable and reliable NAND flash memory
    • Low power consumption
    • Silent operation
    • Ideal for laptops and desktops
  • Additional information
    Vendor: EVM
    Type: storeg device
    Weight::  0.5 kg